CEC Environmental Hub - Cledford Lane, Middlewich

CVM Consulting Provided Detailed Temporary Works Support to this complex project

The new CEC Environmental Hub located on Cledford Lane, Middlewich, Cheshire involved the refurbishment of an existing masonry structure to create a modern office environment for Chesire East Council as part of the development of a Waste Transfer Centre.

CVM Consulting were appointed as the lead temporary works designers providing safe practical solutions to complex temporary works requirements.

CVM Consulting were appointed by Democon Ltd who provided a specialist demolition and construction service to Wates Group who were the principal contractor.

As CVM Consulting have both Chartered Civil and Structural Engineers who have specialist experience in the design of Temporary & Permanent works we were engaged to undertake an initial appraisal of the existing structure which then enabled us to develop practical temporary works solutions in order to facilitate the refurbishment works.

The Construction Design and Management Regulations 2015 place specific emphasis on the consideration of how a structure will be constructed and what temporary works would be required to ensure that safe construction is considered throughout.  CVM Consulting are uniquely positioned to be able to offer this service.

© 2015 CVM Projects Ltd trading as CVM Consulting Engineers

Registered Office 68 Liverpool Road, Stoke on Trent, ST4 1BG

VAT Number 189 6092 57