Hardings Row, Mow Cop, Stoke on Trent

CVM Consulting were appointed to undertake an extensive domestic refurbishment
External
External

Domestic Refurbishment

press to zoom
Lounge
Lounge

Prior to Refurbishment

press to zoom
Kitchen
Kitchen

After Refurbishment

press to zoom
External
External

Domestic Refurbishment

press to zoom

This stunning refurbishment project was completed in 2016 CVM Consulting were appointed to undertake the structural design of the internal modifications.

 

Due to the age of the property and the use of traditional building methods adopted when it was originally constructed, CVM Consulting carefully considered the most appropriate methods for achieving the Client's desired outcomes whilst ensuring that the modifications could be carried out using safe construction methods.

The refurbishment resulted in a stunning property with a more contemporary open plan layout.